Customization: | Available |
---|---|
After-sales Service: | China |
Automatic Grade: | Semi-Automatic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
4 Feet Log Debarker Machine
|
||||
Model
|
GTLD130
|
|||
Log dimension processing
|
500 *1400 mm
|
|||
Rotary knife specification
|
1500 * 180 *16 mm
|
|||
Diameter of rollers
|
150 mm
|
|||
Linear speed
|
50m/min
|
|||
Reference output
|
30 m³/ day
|
|||
Hydraulic system power
|
7.5 kW
|
|||
Driving roller power
|
5.5 kW * 2 or 7.5 kW * 2
|
|||
Pressure roller power
|
5.5 kW * 2 or 7.5 kW * 2
|
|||
Feeding cylinder diameter
|
80 mm * 2
|
|||
Product dimension
|
4000 * 2200 * 1800 mm
|
|||
Weight
|
4000 kgs
|
8 Feet Log Debarker Machine
|
||||
Model
|
GTCOLD2700
|
|||
Log dimension processing
|
500 * 2700
|
|||
Rotary knife specification
|
2700 * 180 * 16mm
|
|||
Linear speed of host machine
|
45 m/min
|
|||
Power of hydraulic system motor
|
7.5 kW
|
|||
Power of single roller
|
11 kW * 2
|
|||
Power of double roller
|
7.5 kW * 2
|
|||
Diameter of cylinder
|
80 mm
|
|||
Overall dimension
|
5200 * 2000 *2200 mm
|
|||
Weight
|
6 tons
|
Pre-sale service:
1) Listen to customer needs
2) Provide free preliminary machine design plan and flow chart,choose and supply the most reasonable configuration equipment;
3) Support remote meetings and visit factory remotely;
4)Offer the professional advice to customer to confirm the final selection
5) Support site visits to factory;
In-sale service
1) All equipment is qualified for installation and commissioning before leaving the factory; supports remote video quality inspection;
2) The disassembly and packaging process of all machines before leaving the factory, providing photos, videos, and annotations;
3) Online or offline free training of buyers' operators (China)
4) Assist buyers to install and debug equipment (overseas)
After-sales service
1) 7*24 hours online service; remote real-time video resolution;
2) During the first installation and commissioning process, problems encountered during normal operation should be solved in time;
3) Periodic process inspection and use effect, and timely suggestions for machine maintenance;
4) Lifetime free technical guidance
5) Update the latest industry information in a timely manner.